sub-section from the bottom up horizontal
#1
the board to squeeze tight, no seams, because the cut is not straight Gaps, stuffed with adhesive and smooth. Every sticky one, should be squeezed out of the surface of the special adhesive removal. (8) The composite cement foam board should be pasted along the horizontal pavement, each row of board should be wrong slot 1/2 board length, the local minimum error
of not less than 100. 2, the process of installing the fixture 1) The fixture is installed in the composite cement foaming board 8 hours after the installation, and in the next 24 hours to complete. According to the design requirements of the location of the hole with a percussion drill, hole 10, into the grassroots wall depth of about 60, fixed anchor into the grassroots wall depth of about 50, to ensure solid and reliable.
(2) The number of fasteners set one per board. (3) The self-tapping screw should be squeezed tightly and the surface of plastic expansion nail cap and composite cement foam board should be tightened or slightly screwed in to ensure that the tail of the expansion nail is screwed back and screwed sufficiently to anchor with the primary wall. 3, polished: (1) composite cement foam board uneven seam application
black composite decking boards
thin plastic walls cladding for bad walls
particle board storage cabinets
Reply


Possibly Related Threads...
Thread Author Replies Views Last Post
  Depend on of bottom qizhen0809 0 754 06-05-2018, 10:54 AM
Last Post: qizhen0809
  point of horizontal qizhen0809 0 618 05-15-2018, 07:06 AM
Last Post: qizhen0809
  Depend on of bottom qizhen0809 0 709 05-14-2018, 12:10 PM
Last Post: qizhen0809
  Depend on of bottom qizhen0809 0 771 04-27-2018, 03:40 AM
Last Post: qizhen0809
  bottom of discharge qizhen0809 0 776 03-27-2018, 02:40 AM
Last Post: qizhen0809
  bottom of discharge qizhen0809 0 927 03-15-2018, 10:13 AM
Last Post: qizhen0809

Forum Jump:


Users browsing this thread: