11-09-2017, 07:03 AM
to use 200mm plywood made of the border, the outlet around 200mm to brush the varnish, can prevent the absorption of moisture after the wood material moldy. 6, wall background wall construction points (1) board grade, quality and wood keel specifications and moisture content must comply with the relevant provisions of the country, wood keel need to brush fire paint and then use. (2) decorative panel background with 300mm �� 300mm standard keel frame,
frame and wall connection with 8mm �� 100mm expansion screw fixed, the bottom plate thickness should not be less than 9mm, gypsum board cover the background wall using light steel keel production base frame The (3) background wall production Before installation should check the vertical and flatness of the grassroots, wood backdrop, wall and wall, ceiling, ground parts to brush 30cm high moisture-proof varnish and pad put pearl cotton The (4) before the
construction according to the design requirements pop-up elevation, vertical control lines, grid lines, perforated installation of stakes or wooden wedge, the depth of not less than 40mm, and do moisture and corrosion treatment. (5) wall backdrop installation must be firm, flat, with aluminum alloy foot test error is less than 1mm, the vertical error is less than 2mm, the same side of the same shape must be in the same level, the size and size must be consistent. Warm
synthetic boat decking market
harga pengubahsuaian siling penang
color combinations for deck and arbor
frame and wall connection with 8mm �� 100mm expansion screw fixed, the bottom plate thickness should not be less than 9mm, gypsum board cover the background wall using light steel keel production base frame The (3) background wall production Before installation should check the vertical and flatness of the grassroots, wood backdrop, wall and wall, ceiling, ground parts to brush 30cm high moisture-proof varnish and pad put pearl cotton The (4) before the
construction according to the design requirements pop-up elevation, vertical control lines, grid lines, perforated installation of stakes or wooden wedge, the depth of not less than 40mm, and do moisture and corrosion treatment. (5) wall backdrop installation must be firm, flat, with aluminum alloy foot test error is less than 1mm, the vertical error is less than 2mm, the same side of the same shape must be in the same level, the size and size must be consistent. Warm
synthetic boat decking market
harga pengubahsuaian siling penang
color combinations for deck and arbor