01-07-2018, 02:41 PM
control load of the single-story lightweight gantry structure. 2. A high degree of industrialization, the construction cycle Short-door rigid frame structure of the main components and accessories for the factory production, easy to ensure the quality of the site to facilitate installation; except for basic construction, basically no wet work; the connection between components and more use of high Strength bolt connection, quick installation. 3. Comprehensive economic
benefits High-gantry rigid frame structure usually adopts computer-aided design with short design cycle, single type of raw materials, advanced automation equipment and components, convenient transportation and so on. Therefore, the portal frame structure of short construction cycle, quick return on capital, investment returns are relatively high. 4. Column network more flexible layout Traditional reinforced concrete structure due to the roof panels, wallboard size
constraints, more than 6 meters spacing, when using 12 meters spacing, the need to set the bracket and wall column. The portal frame structure of the enclosure system using metal pressure plate, so the column network is not limited by the modulus, the size of the main column according to the requirements and the use of steel the most provincial principle to determine. Second, matters needing attention 1. Due to the portal rigid frame structural members of the
heated dog houses for sale
patio deck railing russia
outdoor wood forced air furnace
benefits High-gantry rigid frame structure usually adopts computer-aided design with short design cycle, single type of raw materials, advanced automation equipment and components, convenient transportation and so on. Therefore, the portal frame structure of short construction cycle, quick return on capital, investment returns are relatively high. 4. Column network more flexible layout Traditional reinforced concrete structure due to the roof panels, wallboard size
constraints, more than 6 meters spacing, when using 12 meters spacing, the need to set the bracket and wall column. The portal frame structure of the enclosure system using metal pressure plate, so the column network is not limited by the modulus, the size of the main column according to the requirements and the use of steel the most provincial principle to determine. Second, matters needing attention 1. Due to the portal rigid frame structural members of the
heated dog houses for sale
patio deck railing russia
outdoor wood forced air furnace