Wood floor installation process needs to be meticulous
#1
Detection of ground moisture content, the average ground should be less than 20%, floor heating of the floor should be less than 10%. If the ground moisture content is too high, the floor easily absorb water swelling, resulting in arching, drumming and other issues. Check the ground is dry, smooth, solid, should ensure that the surface of the ground every 2 meters height difference is not more than 3mm. Before paving the floor, the floor should be laid flat at room temperature for 48 hours, to adapt to the installation environment temperature and humidity. Do not erect or tilt the floor against the wall.
Floor and wall, columns and other fixed objects must be set aside 8-10mm expansion joints, the length and breadth of any side of more than 8m of the ground, leaving more than the length of the floor between the two 8-10mm additional expansion joints. Floor installation should start from the upper left corner of the room, floor tenons against the wall, and walls, pipes and other fixed objects should be set aside for the reservation of 8-12mm seam, and the use of wedges for positioning.
It is best to stagger a distance of not less than 30 cm between the ends of each floor. In the bathroom, balconies and other places easily accessible by the damp, the floor should be waterproof isolation treatment, to ensure impermeability. The best way to install the floor is parallel to the direction of most of the light coming in through the window, or parallel to the longer walls of the living room.
Note that the floor can be installed on a plumbing floor but not on a warm floor. The last piece of the floor to be installed in each row should be saw out of the last piece of extra parts, sawing the excess part should be more than 30cm, can be used for the beginning of the next row of the installation.
"refinish engineered hardwood flooring,which is better product marideck vinyl or lonseal vinyl,outdoor decking railing tops"
Reply


Possibly Related Threads...
Thread Author Replies Views Last Post
  Oil And Gas Process Software'20 dvdget3 0 398 10-28-2020, 10:31 AM
Last Post: dvdget3
  Oil And Gas Process Software'20 dvdget3 0 452 10-27-2020, 01:41 PM
Last Post: dvdget3
  Oil And Gas Process Software'20 dvdget3 0 424 10-14-2020, 01:05 AM
Last Post: dvdget3
  tecnomatix v14.02 Process Simulate Designer dvdget3 0 413 10-13-2020, 11:28 PM
Last Post: dvdget3
  TWI RiskWISE 5 for Process Plant v5.1.0.28350 dvdget3 0 401 10-12-2020, 02:05 PM
Last Post: dvdget3
  Oil And Gas Process Software'20 dvdget3 0 391 10-12-2020, 02:39 AM
Last Post: dvdget3
  Oil And Gas Process Software'20 dvdget3 0 341 10-11-2020, 02:19 PM
Last Post: dvdget3
  tecnomatix v14.02 Process Simulate Designer dvdget3 0 380 10-11-2020, 12:33 PM
Last Post: dvdget3
  Oil And Gas Process Software'20 dvdget3 0 369 10-10-2020, 06:04 AM
Last Post: dvdget3
  Oil And Gas Process Software'20 dvdget3 0 320 10-08-2020, 10:13 PM
Last Post: dvdget3

Forum Jump:


Users browsing this thread: 1 Guest(s)