Wooden floor laying process
#1
Third floor, seven points installation. Consumers want to have a comfortable wooden floor, not only the quality of the floor itself better, the floor installation process is also very important. In order to let everyone in the future home life, to avoid due to improper installation of floor problems, Xiaobian will show consumers in detail the installation process of multi-layer solid wood flooring.
1, measuring the room area:Before installing the floor, you need to accurately measure the pavement area of the room so that you can fully understand the material loss during paving.
2, grass-roots processing:The first step before formally paving the floor is to handle the grassroots workplaces, mainly to repair the problem ground and form a new grassroots level so as to avoid the arching of the floor due to the original grass-roots emptying and cracking. After doing a good job at the grassroots level, you need to level the ground. If the ground is not flat, not only will lead to cracks in the baseboard, the whole floor will be uneven, and abnormal sound, but also seriously affect the quality of the floor.
3, leveling the ground:The ground level of error can not exceed 2mm, more than that, we must find ways to balance the. If the ground is not flat, not only will lead to cracks in the baseboard, the whole floor will be uneven, and abnormal sound, but also seriously affect the quality of the floor.
4, open package pick the color and determine the direction of paving:In the pavement before the floor in accordance with the principle of color and texture as much as possible, in the process can also check the floor whether the size of the head or head cracking and other issues.
"decking timber suppliers perth,how to build corner deck bench,wood floors for boats"
Reply


Possibly Related Threads...
Thread Author Replies Views Last Post
  Oil And Gas Process Software'20 dvdget3 0 398 10-28-2020, 10:31 AM
Last Post: dvdget3
  Oil And Gas Process Software'20 dvdget3 0 452 10-27-2020, 01:41 PM
Last Post: dvdget3
  Oil And Gas Process Software'20 dvdget3 0 424 10-14-2020, 01:05 AM
Last Post: dvdget3
  tecnomatix v14.02 Process Simulate Designer dvdget3 0 413 10-13-2020, 11:28 PM
Last Post: dvdget3
  TWI RiskWISE 5 for Process Plant v5.1.0.28350 dvdget3 0 401 10-12-2020, 02:05 PM
Last Post: dvdget3
  Oil And Gas Process Software'20 dvdget3 0 391 10-12-2020, 02:39 AM
Last Post: dvdget3
  Oil And Gas Process Software'20 dvdget3 0 342 10-11-2020, 02:19 PM
Last Post: dvdget3
  tecnomatix v14.02 Process Simulate Designer dvdget3 0 380 10-11-2020, 12:33 PM
Last Post: dvdget3
  Oil And Gas Process Software'20 dvdget3 0 370 10-10-2020, 06:04 AM
Last Post: dvdget3
  Oil And Gas Process Software'20 dvdget3 0 323 10-08-2020, 10:13 PM
Last Post: dvdget3

Forum Jump:


Users browsing this thread: 1 Guest(s)