03-23-2018, 11:28 PM
within the range of 1.2-1.6M. Laying light insulation layer ceiling spacing should be 1.2M. Light and overhaul should increase the boom location. (3) According to the installation level ceiling of the wall ceiling, use steel nails to fix the aluminum edge keel nails on the wall, the nail pitch should be 30-40, the edge keel should be straight and firm. (4) The use of galvanized wire for the boom material is hanging tendons, concrete
floor concrete installation method is to use a nail gun in the location of the tendons will be fixed with holes in the floor nailing can also be used without holes Fixing the metal hanging code on the floor of the floor. With 14-16 galvanized lead wire for the tendons, the lead wire into the perforation or hanging code hanging solid, hook the bottom hook hanging in the main keel hanging hole, the tendons should be vertical down, with
alder to hold the tension . Of course, also available 8-12 galvanized lead wire points up and down two sections, in the middle of expansion spring steel connection, easy to adjust the length of the suspension bar. (5) When installing the main keel to be pulled flat cross the level of communication, the adjacent main keel abdomen to be transferred in a straight line, and should control the hole through the pass line. Tension tendons
cedar wood fence panels
wood plastic swimming pool deck in india
decking board kits
floor concrete installation method is to use a nail gun in the location of the tendons will be fixed with holes in the floor nailing can also be used without holes Fixing the metal hanging code on the floor of the floor. With 14-16 galvanized lead wire for the tendons, the lead wire into the perforation or hanging code hanging solid, hook the bottom hook hanging in the main keel hanging hole, the tendons should be vertical down, with
alder to hold the tension . Of course, also available 8-12 galvanized lead wire points up and down two sections, in the middle of expansion spring steel connection, easy to adjust the length of the suspension bar. (5) When installing the main keel to be pulled flat cross the level of communication, the adjacent main keel abdomen to be transferred in a straight line, and should control the hole through the pass line. Tension tendons
cedar wood fence panels
wood plastic swimming pool deck in india
decking board kits